Steam blowing is critical if you want to ensure piping, boilers, and gas turbines are not contaminated with mill scale, debris and grease before full operation. With proper steam blows, you can protect your turbines and plant equipment from damage upon startup or operation, potentially saving millions in repairs and unplanned downtime. This procedure forces steam through piping at high pressure, to create a drag force that will remove debris. If done improperly, steam blowing runs the risk of overheating sensitive elements, endangering the eardrums of unprepared bystanders and leaving the system unready for operation.
One basic precaution includes using dry silencers that don’t require water injection to reduce noise, which can make a huge difference in risk during the procedure.
When piping is attached to a steam turbine, the turbine OEM has a guideline for steam blowing. There are several methods, referenced in NEMA 23 and NEMA 24 guidelines.
The accepted method for a steam blow, per NEMA 23 and NEMA 24, is an impulse blow, in which you:
Historically, steam blowing has been a noisy, hot, dangerous process.
In the past, steam blows were louder than roaring jet engines. They used an open-ended pipe to vent high-speed steam into the open air, often breaking glass windows in nearby facilities — needless to say, the noise was well above OSHA standards.
In addition, rapid temperature increases and decreases can impair overall system performance, so manufacturers of boiler/heat recovery steam generators have put limits on the rate of temperature variation during steam blows.
The traditional approach to steam blowing is to pump puffs of steam through sections of a system. To reduce sound and temperature dangers, the key here is to use a system of:
In this approach, puffs of steam are blown through the system, beginning at lower pressure and slowly increasing in pressure as necessary, and regulated using quick-opening hydraulic actuated valves.
To control noise, a steam exhauster/silencer is also used. In addition, temporary piping from the temporary steam turbine exit is used with water injection along the temporary pipe, limiting the volume of steam before it reaches the steam exhauster/silencer.
Due to the high pressures of exhaustive steam blows, permanent and temporary systems are subjected to high vibrations and stress. In addition, puffing can take weeks to achieve OEM-specified cleanliness levels.
One way to control noise, limit temperature fluctuations, and speed up the process, is to use the continuous blowing method. In continuous blowing, there’s one continuous, low-pressure blow performed around the clock at a steady temperature and pressure. In this process:
An impulse, or puffing, steam blow requires many valves to close and open to exhaust steam at a good cleaning force, cleaning small sections at a time. But a continuous steam blow is always flowing, so the cleaning force is higher down the line as pressure drops near the exit.
At Energy Services International, we provide comprehensive steam blowing services that:
We’ve served companies nationwide and can help you quickly get your system up to specifications. Contact us to discuss your specific needs.
We are excited to be attending the GE 7F Users Group Conference from May 23-27,…
Reliable Industrial Group will be attending POWERGEN International & DISTRIBUTECH International May 23-25th in Dallas, Texas.…
HOUSTON, March 24, 2022 - Reliable Industrial Group (RIG) and Hydrocarbon Filtration have joined forces to expand the…
HOUSTON, Texas – Industrial chemical cleaning and lube oil flushing company Elden Consultants & Industrial…
Did you know that through our partnership with Exxon Mobil Serv program we provide mining…