RIG responded to an emergency High Velocity Oil Flush on the facilities ethylene compressor within 48 hours and was awarded additional work due to the professionalism and commitment to assisting a company in need. RIG’s quick reaction time over 2020 New Year holiday kept Arlanxeo’s downtime to a minimum. Emergency or scheduled RIG is here to assist you will all of your flushing needs.
RIG was contracted in Q1 2020 to provide engineering and execution of hydrotesting and High Velocity Oil Flushing (HVOF) of six hydraulic systems during pre-commissioning of the facility. Testing included pressures up to 7500 PSI of all installed piping followed by HVOF to meet OEM cleanliness specifications.
RIG’s Team was contracted by McDermott as a single source vendor to engineer and execute degreasing, gas line air blows, hydrolazing, steam blows, pigging and High Velocity Oil Flushing (HVOF) for the Montgomery Energy Center’s new 2 X 1 combined cycle plant.
RIG was contracted during Q4 2019 into Q1 2020 as a single source vendor to perform steam blows, gas line blows, HRSG chemical cleaning, hydrotesting, boiler degreasing, and High Velocity Oil Flushing (HVOF) services.
RIG was contracted by US Engineering to develop and execute Jet Fuel A delivery line flushing activities during pre-commissioning. RIG’s engineered procedure assured the Jet Fuel A flush safely met designated cleanliness criteria safely. See all precommission & reliability services