Combined Cycle

McDermott – Montgomery County Energy Center

Montgomery County, Texas

Project Summary

RIG’s Team was contracted by McDermott as a single source vendor to engineer and execute degreasing, gas line air blows, hydrolazing, steam blows, pigging and High Velocity Oil Flushing (HVOF) for the Montgomery Energy Center’s new 2 X 1 combined cycle plant.

 

(more…)

Mas Tec – Ciner CHP Project

Green River, Wyoming

Project Summary

RIG was contracted during Q4 2019 into Q1 2020 as a single source vendor to perform steam blows, gas line blows, HRSG chemical cleaning, hydrotesting, boiler degreasing, and High Velocity Oil Flushing (HVOF) services.

 

(more…)

Bechtel Infrastructure & Power Cricket Valley Energy Center

Dover Plains, New York

Project Summary

RIG was contracted by Bechtel to engineer and execute the hydrostatic testing and chemical cleaning on multiple Heat Recovery Steam Generators (HRSG) at the Cricket Valley Energy Center in Dover Plains, New York.  See all precommission & reliability services
(more…)

Solar Turbines Aftermarket Group

USA

Project Summary

RIG has teamed up with the Solar Aftermarket Team to identify and mitigate varnish deposits from turbines across the United States. RIG has effectively mitigated varnish from power plants within colleges, municipal power facilities, gas plants and manufacturing facilities. In most cases RIG can reduce varnish levels within a month while the system is in operation. If you are experiencing varnish in your lubricant call us today: 800-770-4510

(more…)

Dresser Rand – Siemens

Snyder, TX

Project Summary

RIG was contracted as a partner to Dresser Rand (a Siemens Company) to perform oil flushing services on a Turbodyne Steam Turbine. (more…)

Progress Energy

Lakeland, FL

Project Summary

Hines Power Block Progress Energy Lakeland, FL – Chemical Plant Commissioning Project- New Combined Cycle project- Nooter Eriksen HRSG’s,  Westinghouse CT’s and STG-performed citric acid CC, hydrolazing of all steam piping, airblows on Block 2 and continuous steamblows on Block 3.

West County Energy Center

Loxahatchee, FL

Project Summary

West County Energy Center FPL 2-3X1’s Loxahatchee FL – EDTA cleaning of the HRSG’s, OF on the CT’s and STG and continuous steam blows. See all precommission & reliability services

Power Plant Electro-Hydraulic Control (EHC)

Fluid Swap

Project Summary

Switching from a vegetable-based ester to a polyalkylene glycol EHC lubricant was proving challenging for a power plant because of the incompatibility of the two fluids. The replacement fluid  (more…)