Reliability Services

Dresser Rand – Siemens Arlanxeo

Sarnia, Ontario

Project Summary

RIG responded to an emergency High Velocity Oil Flush on the facilities ethylene compressor within 48 hours and was awarded additional work due to the professionalism and commitment to assisting a company in need.  RIG’s quick reaction time over 2020 New Year holiday kept Arlanxeo’s downtime to a minimum. Emergency or scheduled RIG is here to assist you will all of your flushing needs.

 

(more…)

US Engineering- Kansas City International Airport Terminal Expansion Project

Kansas City, Missouri

Project Summary

RIG was contracted by US Engineering to develop and execute Jet Fuel A delivery line flushing activities during pre-commissioning. RIG’s engineered procedure assured the Jet Fuel A flush safely met designated cleanliness criteria safely. See all precommission & reliability services

(more…)

Wood. Duke Energy – Lincoln Turbine Station Expansion

Stanley, North Carolina

Project Summary

RIG was contracted by Wood Group as a single source provider for engineering and execution of pigging, gas line air blows, hydro-testing and pipe drying services for the Duke Energy Lincoln Turbine Station expansion project.

(more…)

Westlake Polymers Lard Oil

Sulphur, Louisiana

Project Summary

RIG worked with local ExxonMobil Distributor (Lard Oil) to execute chemical cleaning and High Velocity Oil Flushing (HVOF) activities on the Westlake Polymer’s Clark MALB compressor piping
(more…)

Bechtel Infrastructure & Power Cricket Valley Energy Center

Dover Plains, New York

Project Summary

RIG was contracted by Bechtel to engineer and execute the hydrostatic testing and chemical cleaning on multiple Heat Recovery Steam Generators (HRSG) at the Cricket Valley Energy Center in Dover Plains, New York.  See all precommission & reliability services
(more…)

Valero

Wilmington, California

Project Summary

RIG was contracted in January 2020 to chemically clean the waste heat boiler located at the Wilmington Fuels Refinery. The degreasing process removed the preservative placed by the manufacturer and readied the unit for operation.

(more…)

Low & Bonar

Candler, North Carolina

Project Summary

RIG reacted to an emergency call to help Low & Bonar back into production. In February 2020 L&B’s Filteco hot oil system’s piping became blocked with oxidized heat transfer fluid. RIG utilized a high temperature synthetic flushing fluid to clean the oxidized, thermally degraded contaminated fluid. The same unit was then used to filter replacement heat transfer fluid, allowing the plant to get running again.

(more…)

Steel Dynamics

Butler, Indiana

Project Summary

RIG provided portable vacuum dehydration equipment for side stream water and particulate removal from central lubrication systems. RIG’s unit was utilized for contamination control (without experiencing any down time) of multiple systems over a 3-month period in 2019.  RIG’s fleet of dehydrators and filtration equipment are ready to roll to your site today. For more information call 800-770-4510

(more…)

Solar Turbines Aftermarket Group

USA

Project Summary

RIG has teamed up with the Solar Aftermarket Team to identify and mitigate varnish deposits from turbines across the United States. RIG has effectively mitigated varnish from power plants within colleges, municipal power facilities, gas plants and manufacturing facilities. In most cases RIG can reduce varnish levels within a month while the system is in operation. If you are experiencing varnish in your lubricant call us today: 800-770-4510

(more…)