Specialty Chemicals

Westlake Polymers Lard Oil

Sulphur, Louisiana

Project Summary

RIG worked with local ExxonMobil Distributor (Lard Oil) to execute chemical cleaning and High Velocity Oil Flushing (HVOF) activities on the Westlake Polymer’s Clark MALB compressor piping
(more…)

LyondellBasell

Channelview, TX

Project Summary

RIG was contracted in 2019 to provide engineering documents and flush plans in both the OP1 and MEOH Areas leading into the Spring 2020 Turnaround. RIG’s work with the local distributor and TA planners led to more effective processes in pipe spool cleaning, custom built materials, and execution of the varnish mitigation and oil flushing of seven compressors during the TA.

 

LyondellBasell

Clinton, IA

Project Summary

RIG was contracted in 2018 to engineer and execute varnish mitigation and oil flush on five compressor trains during LyondellBasell’s 2019 turnaround. (more…)

Chlorine Chemical Plant

Steam Turbine and Power Pack Cleaning

Project Summary

A major chlorine manufacturer reached out after a failed attempt to perform an onboard cleaning of the piping powerhouse on a steam turbine and (more…)

Scroll to top