Dresser Rand – Siemens Arlanxeo

Sarnia, Ontario

Project Summary

RIG responded to an emergency High Velocity Oil Flush on the facilities ethylene compressor within 48 hours and was awarded additional work due to the professionalism and commitment to assisting a company in need.  RIG’s quick reaction time over 2020 New Year holiday kept Arlanxeo’s downtime to a minimum. Emergency or scheduled RIG is here to assist you will all of your flushing needs.

 

(more…)

Abengoa – Fulcrum Sierra Biofuels Plant

Sparks, Nevada

Project Summary

RIG was contracted in Q1 2020 to provide engineering and execution of hydrotesting and High Velocity Oil Flushing (HVOF) of six hydraulic systems during pre-commissioning of the facility. Testing included pressures up to 7500 PSI of all installed piping followed by HVOF to meet OEM cleanliness specifications.

McDermott – Montgomery County Energy Center

Montgomery County, Texas

Project Summary

RIG’s Team was contracted by McDermott as a single source vendor to engineer and execute degreasing, gas line air blows, hydrolazing, steam blows, pigging and High Velocity Oil Flushing (HVOF) for the Montgomery Energy Center’s new 2 X 1 combined cycle plant.

 

(more…)

Mas Tec – Ciner CHP Project

Green River, Wyoming

Project Summary

RIG was contracted during Q4 2019 into Q1 2020 as a single source vendor to perform steam blows, gas line blows, HRSG chemical cleaning, hydrotesting, boiler degreasing, and High Velocity Oil Flushing (HVOF) services.

 

(more…)

US Engineering- Kansas City International Airport Terminal Expansion Project

Kansas City, Missouri

Project Summary

RIG was contracted by US Engineering to develop and execute Jet Fuel A delivery line flushing activities during pre-commissioning. RIG’s engineered procedure assured the Jet Fuel A flush safely met designated cleanliness criteria safely. See all precommission & reliability services

(more…)

Wood. Duke Energy – Lincoln Turbine Station Expansion

Stanley, North Carolina

Project Summary

RIG was contracted by Wood Group as a single source provider for engineering and execution of pigging, gas line air blows, hydro-testing and pipe drying services for the Duke Energy Lincoln Turbine Station expansion project.

(more…)

Westlake Polymers Lard Oil

Sulphur, Louisiana

Project Summary

RIG worked with local ExxonMobil Distributor (Lard Oil) to execute chemical cleaning and High Velocity Oil Flushing (HVOF) activities on the Westlake Polymer’s Clark MALB compressor piping
(more…)

Bechtel Infrastructure & Power Cricket Valley Energy Center

Dover Plains, New York

Project Summary

RIG was contracted by Bechtel to engineer and execute the hydrostatic testing and chemical cleaning on multiple Heat Recovery Steam Generators (HRSG) at the Cricket Valley Energy Center in Dover Plains, New York.  See all precommission & reliability services
(more…)

Valero

Wilmington, California

Project Summary

RIG was contracted in January 2020 to chemically clean the waste heat boiler located at the Wilmington Fuels Refinery. The degreasing process removed the preservative placed by the manufacturer and readied the unit for operation.

(more…)