Low & Bonar

Candler, North Carolina

Project Summary

RIG reacted to an emergency call to help Low & Bonar back into production. In February 2020 L&B’s Filteco hot oil system’s piping became blocked with oxidized heat transfer fluid. RIG utilized a high temperature synthetic flushing fluid to clean the oxidized, thermally degraded contaminated fluid. The same unit was then used to filter replacement heat transfer fluid, allowing the plant to get running again.

(more…)

Steel Dynamics

Butler, Indiana

Project Summary

RIG provided portable vacuum dehydration equipment for side stream water and particulate removal from central lubrication systems. RIG’s unit was utilized for contamination control (without experiencing any down time) of multiple systems over a 3-month period in 2019.  RIG’s fleet of dehydrators and filtration equipment are ready to roll to your site today. For more information call 800-770-4510

(more…)

Solar Turbines Aftermarket Group

USA

Project Summary

RIG has teamed up with the Solar Aftermarket Team to identify and mitigate varnish deposits from turbines across the United States. RIG has effectively mitigated varnish from power plants within colleges, municipal power facilities, gas plants and manufacturing facilities. In most cases RIG can reduce varnish levels within a month while the system is in operation. If you are experiencing varnish in your lubricant call us today: 800-770-4510

(more…)

Exotic Automation & Supply

General Motors Testing Facility, Warren, MI

Project Summary

2019 Expansion of the GM Automotive test stand facility required oil flushing services of thousands of feet of new hydraulic lines ranging from 1-inch to 8-inch diameter. RIG’s custom engineered process and execution assured the lubricant and system piping exceeded servo valve cleanliness levels during commissioning.

Dresser Rand Siemens

Preferred Vendor

Project Summary

Preferred vendor providing High Velocity Oil Flushing (HVOF) and chemical cleaning services during pre-commissioning, emergency services, scheduled turnaround and rebuilds taken off location.

Solar

Preferred Vendor

Project Summary

Preferred vendor for Pre-commissioning High Velocity Oil Flushing (HVOF) and varnish mitigation services with Solar aftermarket.

Mid-Stream Natural Gas Compressor Flushing

Solar Mars 100 Turbine

Project Summary

A new Solar Mars 100 turbine required a lube oil flush for a new cooler at a mid-stream natural gas compressor station. Pickling was not required for this pipeline pre commissioning engineer based project. (more…)

Scroll to top