Contracted to perform oil reconditioning and tank cleaning on a 3000-Ton Press located at an extrusion plant. The work included supplying temporary storage to hold the AW 100, Confined Space Entry Reservoir Cleaning and Vacuum Dehydration/Filtration. The 48-hour cleaning process removed debris and returned ISO contamination to acceptable levels on a tight timeline.

The reservoir contained heavy contamination including carbon, wear metals and a sludge/water mix. While some staining remained on the floor and walls. We were able to manually remove the loose materials using scrapers, squeegees and a wet vac. Final system cleanliness levels were verified with a 40 GPM Filter Unit and 1-micron microglass filter.