Contracted to perform a high velocity hot oil flush of the General Electric turbine at a Power Plant in Indianapolis, IN. Technicians arrived onsite on 12/12/17, completed site specific safety training, and conducted a safety walk down of the work area.
A Job Safety Analysis (JSA) was completed prior to starting. Equipment was offloaded and staging was started. All high flow filtration skids, filter carts, and hoses arrived to the job site hydrotested, checked for functionality, and free of contamination.