Reliability Services

Linde / Praxair HyCO Plant

Clear Lake, Texas

Project Summary

RIG was contracted in December of 2019 to provide experienced personnel, equipment, materials and engineering needed for degreasing stainless steel steam and process lines located at Praxair’s Clear Lake HyCO Plant. See all precommission & reliability services
(more…)

Domtar

Espenola, Ontario

Project Summary

RIG was contracted in December 2019 to engineer and execute a steam blow of the main steam header assuring all debris was removed prior to putting the steam back on-line to the plants turbo-generator. RIG personnel executed the steam blow during the Christmas – New Year Holiday week.

Dresser Rand – Siemens

Snyder, TX

Project Summary

RIG was contracted as a partner to Dresser Rand (a Siemens Company) to perform oil flushing services on a Turbodyne Steam Turbine. (more…)

LyondellBasell

Channelview, TX

Project Summary

RIG was contracted in 2019 to provide engineering documents and flush plans in both the OP1 and MEOH Areas leading into the Spring 2020 Turnaround. RIG’s work with the local distributor and TA planners led to more effective processes in pipe spool cleaning, custom built materials, and execution of the varnish mitigation and oil flushing of seven compressors during the TA.

 

LyondellBasell

Clinton, IA

Project Summary

RIG was contracted in 2018 to engineer and execute varnish mitigation and oil flush on five compressor trains during LyondellBasell’s 2019 turnaround. (more…)

Exotic Automation & Supply

General Motors Testing Facility, Warren, MI

Project Summary

2019 Expansion of the GM Automotive test stand facility required oil flushing services of thousands of feet of new hydraulic lines ranging from 1-inch to 8-inch diameter. RIG’s custom engineered process and execution assured the lubricant and system piping exceeded servo valve cleanliness levels during commissioning.

Turbine HPT5 Bearing

Inspection Screen Cleanup

Project Summary

Provided services after a different flushing provider left a flange slip screen in place in front of turbine’s HP T5 Bearing.
(more…)

Power Plant GE Turbine HVOF

Indianapolis, IN

Project Summary

Contracted to perform a high velocity hot oil flush of the General Electric turbine at a Power Plant in Indianapolis, IN. (more…)

Extrusion Plant

3000-Ton Press Reservoir Clean and Oil Reconditioning

Project Summary

Contracted to perform oil reconditioning and tank cleaning on a 3000-Ton Press located at an extrusion plant. The work included (more…)