Project Summary

Preferred vendor for Pre-commissioning High Velocity Oil Flushing (HVOF) and varnish mitigation services with Solar aftermarket.

Turbine HPT5 Bearing

Inspection Screen Cleanup

Project Summary

Provided services after a different flushing provider left a flange slip screen in place in front of turbine’s HP T5 Bearing.
(more…)

Solar Taurus Varnish

Solar Taurus 60 Gas Turbine Cogeneration Facility

Project Summary

Facilitated varnish mitigation on a Taurus 60 gas turbine. The Membrane Patch Colorimetry (MPC) analysis revealed (more…)

Siemens Turbine Repair

Following Major turnaround on Westinghouse 501AA

Project Summary

Contracted by the DR/Siemens Turbine Repair team to perform a High Velocity Oil Flush (HVOF) on the Unit #1 Westinghouse 501AA (more…)

Power Plant GE Turbine HVOF

Indianapolis, IN

Project Summary

Contracted to perform a high velocity hot oil flush of the General Electric turbine at a Power Plant in Indianapolis, IN. (more…)

Extrusion Plant

3000-Ton Press Reservoir Clean and Oil Reconditioning

Project Summary

Contracted to perform oil reconditioning and tank cleaning on a 3000-Ton Press located at an extrusion plant. The work included (more…)

Refinery Chemical Cleaning

Refinery Gas Turbine

Project Summary

A lube oil system for a gas compressor at a major refinery had not been cleaned in over 30 years. The unit was down for major maintenance program (more…)

Chlorine Chemical Plant

Steam Turbine and Power Pack Cleaning

Project Summary

A major chlorine manufacturer reached out after a failed attempt to perform an onboard cleaning of the piping powerhouse on a steam turbine and (more…)

Power Plant Electro-Hydraulic Control (EHC)

Fluid Swap

Project Summary

Switching from a vegetable-based ester to a polyalkylene glycol EHC lubricant was proving challenging for a power plant because of the incompatibility of the two fluids. The replacement fluid  (more…)